AAMI Park
The Challenge
As the appointed Project Management team, Claude Neon successfully delivered three 18 metre pylons for Melbourne’s iconic Rectangular Stadium, on time and within budget.
The team worked closely with Major Projects Victoria (MPV), to develop suitable design ideas that not only would complement the unique “bubble” design of the stadium but would ultimately serve to make a branding statement to the market at large.
Once the design was approved, the contract to manufacture and install the pylons was awarded with only 10 weeks before the first international rugby match was to take place at the stadium.
The Result
We engaged our two preferred fabrication/manufacturing plants and two steel frame fabricators, and appointed two experienced installation teams who worked concurrently to deliver and install the pylons at the stadium.
By appointing a Claude Neon Project Manager to each of the manufacturing facilities to supervise the timely manufacture and ensure quality control, we were able to address and resolve issues immediately and without undue delay.
The end result is three visually striking pylon signs.